E2E Energy Solutions
Home
E2E Patented Processes
  • EGRRS Process - EGS
  • Infinite Energy - AGS
Sustainability
About Us
Contact
E2E Energy Solutions
Home
E2E Patented Processes
  • EGRRS Process - EGS
  • Infinite Energy - AGS
Sustainability
About Us
Contact
More
  • Home
  • E2E Patented Processes
    • EGRRS Process - EGS
    • Infinite Energy - AGS
  • Sustainability
  • About Us
  • Contact
  • Home
  • E2E Patented Processes
    • EGRRS Process - EGS
    • Infinite Energy - AGS
  • Sustainability
  • About Us
  • Contact

Ludbreg Project

LUDBREG, CROATIA 'CENTER OF THE WORLD'

1/5

Infinite Energy Pilot and Lunergy Geothermal Project

Project Partners

The Lunergy geothermal project in Ludbreg, Croatia, involves a partnership between the Municipality of Ludbreg, E2E Energy Solutions Inc., and Vis Viva GSM, a Zagreb-based geothermal developer. These entities have formed Lunergy d.o.o. to advance geothermal exploration and development in the area. E2E contributes its patented technology expertise, while Vis Viva GSM provides local development and project execution support. 

Strategic Value

The Lunergy project provides a low-risk, cost-effective way to complete the pilot and prove the Infinite Energy process on a commercial scale. At the same time, it preserves E2E’s ownership position in the larger Lunergy geothermal project. This structure aligns near-term technology validation with long term project participation. 

Pilot Completion and Asset Recovery

Upon successful completion of the pilot, the well will be converted into a conventional production well

and sold into the Lunergy project at market value, estimated at approximately 5 million Euros.

This structure allows E2E to recover a significant portion of the capital invested in the pilot, while

linking the technology demonstration directly to long-term project value.

Infinite Energy Pilot Details

Infinite Energy - AGS

 E2E will begin its patented Infinite Energy pilot in the first well of the Lunergy project at an estimated cost of 7 million Euros. The pilot is intended to demonstrate the operation of thermal siphon within a single well bore using a coaxial configuration and demonstrate the system ability to capture and deliver thermal energy to the su

 E2E will begin its patented Infinite Energy pilot in the first well of the Lunergy project at an estimated cost of 7 million Euros. The pilot is intended to demonstrate the operation of thermal siphon within a single well bore using a coaxial configuration and demonstrate the system ability to capture and deliver thermal energy to the surface at commercial scale for the generation of power and direct heating applications.  

Coaxial AGS

  E2E Energy Solutions patented thermosiphon driven coaxial AGS process is a closed loop system that creates multiple fluid loops with the well bore instead of drilling multiple physical loops used in typical closed loop configurations which greatly reduce CAPEX and risk for a given installation.

Commercial Model

Commercial Model

  

E2E’s long-term plan is to engineer and implement commercial geothermal heat and power solutions through exclusive licensing and royalty arrangements with strategic global partners. 

Follow Up from WGC 2026

Send a message to Domenico (Nick) Daprocida, President and CEO

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Copyright © 2026 E2E Energy Solutions - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept